Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark mode
 
Fri Mar 29 02:41:06 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Reduction in noise due to rail wheel interaction  
1 Answers
Sep 04 2011 (10:56)
General

Entry# 721     
Rang De Basanti^
Reduction in noise due to rail wheel interaction

Wheel-rail interaction is the predominant source of noise emissions from rail operations at conventional speeds. This combines rolling noise and impact noise generated by roughness on the wheel and rail surfaces with squeal noise generated by tangential interaction. Working in the Division of Applied Accoustics at Chalmers University of Technology, Astrid Pieringer has attempted to develop a combined prediction model for these three types of wheel-rail noise which could be used as a design tool for noise reduction. The model combines both two-dimensional and 3D models, taking into account Hertzian and transient effects. The book is an extended version of Pieringer's thesis, prepared over the past five years as part of a government-supported programme of research into railway noise. After reviewing the concepts for modelling wheel-rail interaction, the book considers the implementation of a model based on a time domain. The next section looks at validation and verification methods, and the...
more...
following chapter at possible applications.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy