Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Fri Apr 19 20:03:45 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
How they do ATTACHMENT/DETACHMENT of Pantry Car?  
3 Answers
Mar 26 2012 (16:00)
General

Entry# 1062     
Capt MOHANDASS ARICHANDRAN
How they do ATTACHMENT/DETACHMENT of Pantry Car?

6571 views
0
Mar 26 2012 (15:52)
Blog Post# 381317-0     
bisu   Added by: Capt MOHANDASS ARICHANDRAN  Mar 26 2012 (16:00)
*this post is link with Entry 380475
ABOUT ATTACHMENT/DETACHMENT OF PC OF 12859/60
the composition -SLR-GEN-GEN-A2-A1-B2-B1-S14-PC-S13-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-GEN-LDS will stand at maintenence yard after arriving Howrah Jn @ 12.30 hrs.
Then, the composition will be spillited into two parts:-
1.
...
more...
-SLR-GEN-GEN-A2-A1-B2-B1-S14-PC
2. -S13-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-GEN-LDS
the S13-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-GEN-LDS will be taken to other line for sometime.
Now, in the -SLR-GEN-GEN-A2-A1-B2-B1-S14-PC is standing on another line. The PC is now at the end not at middle. So,it will be easy to detach.So, PC will be detached and taken to 3rd LINE.
Then -SLR-GEN-GEN-A2-A1-B2-B1-S14-PC will be brought to S13-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-GEN-LDS and joined together.
The rake formed is -SLR-GEN-GEN-A2-A1-B2-B1-S14--S13-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-GEN-LDS
Now This rake will leave Howrah at 19.00 hrs as Shri Jagannath Express.

8001 views
1
Mar 26 2012 (15:23)
Blog Post# 380475-24     
Guest: 2a1b37ae   Added by: Capt MOHANDASS ARICHANDRAN  Mar 26 2012 (16:09)
Consider a train with L-X-X-X-PC-X-X arrived at the station.. then the gauge men at the station will detach the coupling at the PC and then new comp will be L-X-X-X-PC and X-X. the Loco will now pull the first part and till it reaches a change point.. As soon as it passes the change point Jn. Another loco will come and fit at the PC side and then the gauge man will remove the PC couping at the other end.. With the help of change point, the loco will pull the PC aside, through the Jn.. The old Loco will push back the rake (without the PC) and then attach at the remaining on the platform of pit line making the new rake comp as L-X-X-X-X-X
Hope
...
more...
its clear ... :)

8354 views
2
Mar 26 2012 (15:32)
Blog Post# 380475-25     
Guest: 2a1b37ae   Added by: Capt MOHANDASS ARICHANDRAN  Mar 26 2012 (16:10)
Part 1.. Rake with the Pantry.. Pantry indicated in Blue
Part 2.. Portion with the pantry moved from the initial rake and a new loco gets attached at the back.... new loco in yellow colour
Part 3.. Loco in Yellow moves with the Lonely Pantry car..
Part 4.. the rake is brought back and attached to the old one ...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy