Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon May 6 18:15:56 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Filters:

Blog Posts by swaroophegde5
Page#    321 Blog Entries  <<prev  next>>
Info Update
4764 views
0

Sep 15 2018 (20:33)  
promethsuresh^~
promethsuresh^~   3547 blog posts
Entry# 3810624              
When will Yeliyur electric substation be ready?
Translate to English
Translate to Hindi

1 Public Posts - Sat Sep 15, 2018

1 Public Posts - Mon Sep 17, 2018

3592 views
2

Sep 17 2018 (11:36)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 3810624-3              
Land acquisition problems from tubinakere KPTCL substation to Y SP. MP Pratap simha has urged DC, Mandya to quickly escalate the issue
Translate to English
Translate to Hindi
General Travel
22547 views
0

Jul 21 2018 (08:21)   18047/Shalimar - Vasco-da-Gama Amaravati Express (PT) | DDS/Dudh Sagar (1 PFs)
swaroopghegde~
swaroopghegde~   638 blog posts
Entry# 3646641            Tags   Past Edits
Is it allowed to alight in Dudhsagar now by train, visit the falls and come back by evening train?
Translate to English
Translate to Hindi

1 Public Posts - Sat Jul 21, 2018

13186 views
0

Jul 21 2018 (15:07)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 3646641-3              
Not even allowed to get down at DDS and walk till falls and go back?
Translate to English
Translate to Hindi

1 Public Posts - Sat Jul 21, 2018

12740 views
0

Jul 21 2018 (15:20)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 3646641-5              
Has anybody else visited it recently?
Translate to English
Translate to Hindi

1 Public Posts - Sat Jul 21, 2018
3 Followers
General Travel
123694 views
16

★★
May 26 2017 (15:38)   S/Shrirangapattana (2 PFs)
promethsuresh^~
promethsuresh^~   3547 blog posts
Entry# 2294022            Tags   Past Edits
When will doubling work at Shrirangapattana and electrification work b/w Yeliyur and Mysore be completed?
Translate to English
Translate to Hindi

7 Public Posts - Fri May 26, 2017

5318 views
5

May 26 2017 (18:15)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-11              
Sir I'm the same member. That was my old id. I never used it. I deleted it now.
Srirangapatna station new track ligation is just delayed because of the lag in platform work. Pf works are almost completed now especially the FOB. We can hear the press release of non interlocking works in anytime soon.
Also pandavapura to chandagirikoppal electrification (wiring) is on full swing. Wiring in progress between pandavapura and srirangapatnam. Laying of poles in 1.7km left out stretch between yeliyur and byadarahalli is complete only in SBC MYS line
Translate to English
Translate to Hindi

2 Public Posts - Fri May 26, 2017

4976 views
1

May 26 2017 (19:01)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-14              
Doubling will complete within first half of June if everything goes well. Electrification may take up some time
Translate to English
Translate to Hindi

1 Public Posts - Sat May 27, 2017

4818 views
1

May 27 2017 (09:17)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-16              
I believe 12007/08 shatabdi would be the first one to get alloted an e loco. Later 16021/22 kaveri, 12577/78 darbhanga, 22681/82 Chennai SF weekly and HWH mys SF. If SWR is Keen it could also start e loco with chamundi and others playing between SBC and MYS. Fingers crossed !!
Translate to English
Translate to Hindi

1 Public Posts - Sat May 27, 2017

4744 views
3

May 27 2017 (09:37)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-18              
Malgudi might get e loco as it comes with the same. I doubt for tippu because it comes with EMD from DWR. Although loco change is also possible in SBC for this train. Many passengers would be converted to MEMU. SBC to MYA is FEDL now. CRS inspection was also done upto yeliyur. There was some news about extending MEMU to mandya but once I heard SWR was thinking about running MEMU upto PANP. We have to wait and see
Translate to English
Translate to Hindi

1 Public Posts - Sat May 27, 2017

2 Public Posts - Tue May 30, 2017

4835 views
0

May 30 2017 (07:26)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-22              
Nonono. The stretch is not yet linked with the existing line. New station of srirangapatna is nearing completion. Tracks laid over the new station with two new platforms and tracks over the 3 bridges are also laid. Just the shifting of existing line over the new line is yet to done. It will be done once FOB works over the station gets completed
Translate to English
Translate to Hindi

1 Public Posts - Tue May 30, 2017

4963 views
0

May 30 2017 (10:20)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-24              
Electrification is going on at full pace now. Now wiring has been taken up from naganahalli station also. Simultaneously both PANP and NHY are taken up leaving S in the middle.
Translate to English
Translate to Hindi

2 Public Posts - Tue May 30, 2017

4918 views
0

May 30 2017 (17:10)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-27              
No sir I don't know anything about this SRDF forum. What is this forum actually?
Translate to English
Translate to Hindi

4585 views
0

May 30 2017 (17:13)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-28               Past Edits
In Mysore pole laying is not completed towards SBC side. Wiring started in NHY may progress towards MYS. By then pole laying would have been completed. Also PANP wiring would be continued towards NHY through S. also not to forget 3-4kms unwired stretch between Y and BDRL. BDRL pole laying is incomplete yet
Translate to English
Translate to Hindi

1 Public Posts - Tue May 30, 2017

4574 views
0

May 30 2017 (19:08)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-30              
Tracks are laid completely including all the three bridges. Just the linking is left behind. Paving works are complete. Provision of sitting and water facility are also done. FOB work is left. And also RUB works on the cauvery north side
Translate to English
Translate to Hindi

2 Public Posts - Tue May 30, 2017

4652 views
0

May 30 2017 (20:49)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-33              
FOOT OVER BRIDGE for crossing of platforms which people seldom use. And Road under bridge where people are forced to use as they have no other choice :-)
Translate to English
Translate to Hindi

2 Public Posts - Tue May 30, 2017

5091 views
0

May 30 2017 (23:58)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-36              
Mys JP runs via kurnool town. If it gets e loco between MYS to GTL loco change needs to be done at 3points in the entire journey. It is less of a chance. But it is an option though. If SWR decides to run all trains with eloco between MYS and SBC then JP SF is a good one to include
Translate to English
Translate to Hindi

6 Public Posts - Wed May 31, 2017

5 Public Posts - Sat Jun 03, 2017

4978 views
0

Jun 04 2017 (08:18)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-49              
CORE SC
Translate to English
Translate to Hindi

1 Public Posts - Sun Jun 04, 2017

4717 views
0

Jun 04 2017 (13:28)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-51              
Sorry I am little busy this weekend. I will update the same in a few days
Translate to English
Translate to Hindi

1 Public Posts - Sun Jun 04, 2017

1 Public Posts - Fri Jun 09, 2017

4677 views
1

Jun 09 2017 (16:35)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-54              
Srirangapatna station works still going on. FOB on verge of completion. Linking not yet complete. PANP station wiring about to complete. NHY station wiring underway
Translate to English
Translate to Hindi

1 Public Posts - Fri Jun 09, 2017

4630 views
1

Jun 09 2017 (16:46)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-56              
Tracks all laid. Only Linking is remaining as observed two weeks ago
Translate to English
Translate to Hindi

1 Public Posts - Sat Jun 10, 2017

5173 views
3

Jun 17 2017 (11:18)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-58              
Status as on 15/06/17
Translate to English
Translate to Hindi

2 Public Posts - Sat Jun 17, 2017

4776 views
1

Jun 17 2017 (16:31)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-61              
Track linking is initiated just yet.
Translate to English
Translate to Hindi

1 Public Posts - Sun Jun 18, 2017

1 Public Posts - Sun Jun 25, 2017

4679 views
0

Jun 25 2017 (19:52)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-64              
Sir I'm out of station. I'll let you know day after tomorrow
Translate to English
Translate to Hindi

2 Public Posts - Fri Jun 30, 2017

4688 views
2

Jul 01 2017 (09:22)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-67              
The status of FOB and station works and linking works
Translate to English
Translate to Hindi

3 Public Posts - Sat Jul 01, 2017

5027 views
0

Jul 01 2017 (17:33)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-71              
Agree. Electrification is going on in its own pace unbothered
Translate to English
Translate to Hindi

2 Public Posts - Mon Jul 03, 2017

1 Public Posts - Tue Jul 04, 2017

2 Public Posts - Wed Jul 05, 2017

7 Public Posts - Mon Jul 10, 2017

5076 views
2

Jul 10 2017 (17:12)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-84              
Track linking is not yet done and still in progress. Pics clicked today on board 12614.
Electrification works.
MYA-Y - complete
Y-BDRL - wiring done till KM103/2 and further poles are erected and fixed but not wired in SBC-MYS section. But pole laying and pit laying process still going on.
BDRL-
...
more...
Still digging works need to be done in PF2. Poles are not yet fixed.
BDRL-PANP - FEDL
PANP-S wiring nearing completion
S - poles at bridges not yet laid
S-NHY - wiring nearing completion
NHY - MNGT - Wiring just initiated.
POST MNGT - only poles are fixed.

Translate to English
Translate to Hindi

2 Public Posts - Thu Jul 13, 2017

1 Public Posts - Sat Jul 15, 2017

4805 views
0

Jul 16 2017 (08:28)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-89              
I'll be traveling there tomorrow. I'll update u as soon as possible
Translate to English
Translate to Hindi

4669 views
1

Jul 17 2017 (08:56)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-90              
Track linking not yet completed
Translate to English
Translate to Hindi

1 Public Posts - Mon Jul 17, 2017

4674 views
0

Jul 17 2017 (11:42)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-92              
Same as the last
Translate to English
Translate to Hindi

1 Public Posts - Mon Jul 17, 2017

1 Public Posts - Mon Jul 24, 2017

4514 views
1

Jul 24 2017 (09:47)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-95              
Track linking not yet done sir. Station works about to complete. Electrification works are going parallel. OHE poles laid and fixed
Translate to English
Translate to Hindi

2 Public Posts - Mon Jul 24, 2017

4393 views
2

Jul 24 2017 (13:15)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-98              
Poles are laid even before linking works are done with their calculation. Even pole laying process on bridges are in progress. MYS JN wiring works in PF 1 &2 initiated. Completion can only be ascertained with substation work at yeliyur
Translate to English
Translate to Hindi

1 Public Posts - Mon Jul 24, 2017

4694 views
1

Jul 24 2017 (13:56)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-100              
Wiring at chandgirikoppal, naganhalli, pandavapura completed. Wiring of palahalli in progress. Byadarahalli pole laying works initiated as of now
Translate to English
Translate to Hindi

1 Public Posts - Mon Jul 24, 2017

4741 views
1

Jul 24 2017 (14:36)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-102              
As of now no substations after Y
Translate to English
Translate to Hindi

2 Public Posts - Mon Jul 24, 2017

1 Public Posts - Sat Jul 29, 2017

4620 views
1

Jul 29 2017 (18:55)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-106              
Track linking not yet started. Painting and barricade works of station in progress
Translate to English
Translate to Hindi

1 Public Posts - Sun Jul 30, 2017

4729 views
1

Jul 30 2017 (10:52)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-108              
Wiring on all 6PF initiated in MYS JN. OHE masts laid and fixed over Srirangapatna. Rest all is the same as last update
Translate to English
Translate to Hindi

1 Public Posts - Sun Jul 30, 2017

1 Public Posts - Mon Jul 31, 2017

2 Public Posts - Tue Aug 01, 2017

1 Public Posts - Wed Aug 02, 2017

4658 views
0

Aug 02 2017 (06:33)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-114               Past Edits
Wiring will be after laying of OHE masts over all 6 bridges. So wiring will be a bit late I think
Translate to English
Translate to Hindi

1 Public Posts - Wed Aug 02, 2017

4741 views
0

Aug 02 2017 (10:36)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-116              
The poles are the masts
Translate to English
Translate to Hindi

2 Public Posts - Sun Aug 06, 2017

3 Public Posts - Tue Aug 08, 2017

1 Public Posts - Fri Aug 11, 2017

4434 views
1

Aug 11 2017 (19:56)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-123              
Sir S&T works in progress. Track linking will be initiated after signal posts installed
Translate to English
Translate to Hindi

3 Public Posts - Fri Aug 11, 2017

1 Public Posts - Sat Aug 12, 2017

4717 views
1

Aug 12 2017 (15:41)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-128              
Electrification process over BDRL, SRIRANGAPATNA BRIDGES and in MYS JN. going on in full swing
Translate to English
Translate to Hindi

4520 views
1

Aug 12 2017 (15:42)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-129              
Painting works over. Barricading not yet completed
Translate to English
Translate to Hindi

2 Public Posts - Sat Aug 12, 2017

2 Public Posts - Sun Aug 13, 2017

3 Public Posts - Mon Aug 14, 2017

9 Public Posts - Tue Aug 15, 2017

1 Public Posts - Wed Aug 16, 2017

3 Public Posts - Thu Aug 17, 2017

1 Public Posts - Fri Aug 18, 2017

4 Public Posts - Sat Aug 19, 2017

2 Public Posts - Fri Aug 25, 2017

4563 views
0

Aug 25 2017 (12:35)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-157              
Sir Mysore yard electrification works taking place. Platform wiring works in progress. Srirangapatna station works still in progress. Track linking not yet initiated
Translate to English
Translate to Hindi

3 Public Posts - Fri Aug 25, 2017

4620 views
2

Aug 25 2017 (14:30)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-161              
Not d goods terminal. Sideline loops beside PF1, shunting line maintainance line and all. No signs about MNGT electrification yet
Translate to English
Translate to Hindi

1 Public Posts - Fri Aug 25, 2017

4597 views
0

Aug 25 2017 (19:30)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-163              
All the pfs are just wired. Fixing of wiring in progress in PF 1&2
Translate to English
Translate to Hindi

1 Public Posts - Fri Aug 25, 2017

4524 views
0

Aug 26 2017 (08:17)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-165              
Wires not fixed at palahalli. 90% fixing done between NHY-S. Pole laying over but catenary fixing in progress
Translate to English
Translate to Hindi

9 Public Posts - Sat Aug 26, 2017

2 Public Posts - Sun Aug 27, 2017

4 Public Posts - Sat Sep 09, 2017

5 Public Posts - Sun Sep 10, 2017

5098 views
2

Sep 10 2017 (10:16)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-187              
Electrification over BDRL in progress. Wiring over Srirangapatna and major bridges taken up and in progress. Mys station electrification almost complete except yard still in progress. Track linking work not yet initiated. Signal posts not yet laid over S.
Translate to English
Translate to Hindi

1 Public Posts - Sun Sep 10, 2017

5031 views
0

Sep 10 2017 (14:58)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-189              
Wiring works taken up
Translate to English
Translate to Hindi

2 Public Posts - Sun Sep 10, 2017

1 Public Posts - Sun Sep 24, 2017

1 Public Posts - Mon Sep 25, 2017

4949 views
0

Sep 27 2017 (17:26)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-194              
Same as the last reply sir. Electrification over BDRL in progress. Wiring over Srirangapatna and major bridges taken up and in progress. Mys station electrification almost complete except yard still in progress. Track linking work not yet initiated. Signal posts not yet laid over S.
Translate to English
Translate to Hindi

4734 views
2

Oct 09 2017 (08:05)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-198              
Energization caution notice
Translate to English
Translate to Hindi

1 Public Posts - Mon Oct 09, 2017

4460 views
1

Oct 09 2017 (10:09)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-200              
Mysalli Ella pfs agide. Yard electrification in progress
Translate to English
Translate to Hindi

14 Public Posts - Mon Oct 09, 2017

2 Public Posts - Fri Oct 13, 2017

4525 views
0

Oct 13 2017 (09:09)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-231              
Sure
Translate to English
Translate to Hindi

1 Public Posts - Fri Oct 13, 2017

4502 views
0

Oct 14 2017 (09:25)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-233              
Wiring at BDRL completed. But along the bridges it's still in progress
Translate to English
Translate to Hindi

6 Public Posts - Sat Oct 14, 2017

4885 views
0

Oct 14 2017 (18:57)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-240              
Sir track linking works not yet completed. And electrification process over S will not be completed until linking works are over. And as fayaz sir quoted from Indian Express, the substation work at Yeliyur is incomplete. KPTCL power lines are no way seen. High tension wire tower and all needs to be laid. SSP works at BDRL is also in masonry stage. And also yard electrification of MYS is still in progress. So considering SWR's interest in its history I don't think commissioning will be done by this year end at all
Translate to English
Translate to Hindi

2 Public Posts - Sat Oct 14, 2017

22681 views
1

Oct 16 2017 (10:26)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-245              
Sub-Sectioning and Paralleling Post (SSP)
One or more SSPs are provided between each FP and adjacent SP depending upon the distance between them. In a double track section, normally three interruptors are provided at each SSP i.e. two connecting the adjacent sub-sectors of up and down tracks and one for paralleling the up and down tracks
Translate to English
Translate to Hindi

2 Public Posts - Mon Oct 16, 2017

4647 views
0

Oct 16 2017 (12:30)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-248              
Sir I haven't visited the place. Although few days back I saw SBs been placed and signal posts at the ends
Translate to English
Translate to Hindi

1 Public Posts - Tue Oct 17, 2017

2 Public Posts - Thu Oct 19, 2017

5 Public Posts - Fri Oct 20, 2017

4882 views
2

Oct 25 2017 (17:09)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-260              
Srirangapatna station works almost over. Updates
Translate to English
Translate to Hindi

1 Public Posts - Wed Oct 25, 2017

4402 views
0

Oct 26 2017 (09:49)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-262              
Sir how can we call workers as lazy and dumb?? They will do what they are instructed to do. And after linking of tracks, train cannot run without signal posts. So signalling works are very much necessarily completed before linking. Although miscellaneous station works could have been completed later
Translate to English
Translate to Hindi

1 Public Posts - Thu Oct 26, 2017

4541 views
0

Oct 26 2017 (11:21)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-264              
No not yet. However I noticed workers cleaning the shurbs around the linking area. Linking maybe completed anytime soon
Translate to English
Translate to Hindi

1 Public Posts - Thu Oct 26, 2017

4686 views
0

Oct 26 2017 (14:55)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-266              
Laying of signal posts completed
Translate to English
Translate to Hindi

1 Public Posts - Thu Oct 26, 2017

5242 views
0

Oct 26 2017 (19:01)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-268               Past Edits
Sir mys junction is 99% electrified. I'm excluding the yard. Where poles are laid. Not catenary fixing done too. Srirangapatna electrification will completed only after doubling. BDRL SSP works swiftly in progress. YELIYUR substation works are in progress but nowhere I could see KPTCL wires. Until yeliyur substation is energised the deadline can't be estimated
Translate to English
Translate to Hindi

1 Public Posts - Fri Oct 27, 2017

1 Public Posts - Sat Oct 28, 2017

4429 views
0

Oct 28 2017 (21:17)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-271              
I disagree. Both the lines at this particular stretch is completely doubled and electrified. Just completing the circuit of connecting the poles to tracks by metal pieces are remaining
Translate to English
Translate to Hindi

1 Public Posts - Sat Oct 28, 2017

1 Public Posts - Tue Oct 31, 2017

4563 views
0

Nov 01 2017 (07:54)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-274              
Sir old bridges will be decommissioned and abandoned in due course sir
Translate to English
Translate to Hindi

2 Public Posts - Wed Nov 01, 2017

8 Public Posts - Thu Nov 02, 2017

4822 views
0

Nov 02 2017 (21:52)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-285              
Sir I travelled today. Track Linking not done.
Translate to English
Translate to Hindi

1 Public Posts - Thu Nov 02, 2017

2 Public Posts - Fri Nov 03, 2017

1 Public Posts - Mon Nov 06, 2017

4616 views
2

Nov 07 2017 (08:06)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-292               Past Edits
CRS done without track linking
Translate to English
Translate to Hindi

9 Public Posts - Tue Nov 07, 2017

1 Public Posts - Fri Nov 10, 2017

2 Public Posts - Thu Nov 16, 2017

1 Public Posts - Sun Nov 19, 2017

4625 views
2

Nov 19 2017 (18:26)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-306              
Sir I have not travelled in d section. News at SWR says commissioning will be done on Tuesday with MPS 80KMPH.
Translate to English
Translate to Hindi

4 Public Posts - Mon Nov 20, 2017

4581 views
2

Nov 20 2017 (19:44)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-312              
Sir KPTCL has not carried it's work. The original tender was dated on July end with a time constraint of 3months. But the same has been delayed and no where I could see the feeders to yeliyur. Note that feeders are brought from a place called tubinakere distanced 4kms from Y-SSP
Translate to English
Translate to Hindi

1 Public Posts - Sun Nov 26, 2017

4483 views
0

Nov 26 2017 (13:14)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-314              
Same as last mentioned sir
Translate to English
Translate to Hindi

3 Public Posts - Sat Dec 02, 2017

2 Public Posts - Sun Dec 03, 2017

3 Public Posts - Mon Dec 04, 2017

11 Public Posts - Tue Dec 05, 2017

4277 views
0

Dec 05 2017 (11:49)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-334              
No sir. I am missing it. I had urgent work. I'm out of station
Translate to English
Translate to Hindi

21 Public Posts - Tue Dec 05, 2017

3 Public Posts - Wed Dec 06, 2017

1 Public Posts - Fri Dec 08, 2017

4246 views
0

Dec 08 2017 (18:44)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-360              
sir I will be traveling next Monday in that section. Will notify here by that time
Translate to English
Translate to Hindi

2 Public Posts - Fri Dec 08, 2017

4550 views
0

Dec 08 2017 (23:35)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-363              
Sir I have witnessed non Shatabdi trains like tippu, Jaipur SF hitting 110kmph in RMGM-BID and in some stretch of PANP-MYA. Also I have witnessed Shatabdi hitting 110 in d same section. Speed restrictions should to removed at many places in the MYS-KGI section so as to ensure uniform speed and reducing the travel time.
Translate to English
Translate to Hindi

3 Public Posts - Sat Dec 09, 2017

4935 views
2

Dec 11 2017 (08:43)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-367               Past Edits
Laying of OHE masts in MYS yard still in progress. TSR of 45KMPH still maintained at srirangapatna outer. And also Y-SUB STATION work complete. But KPTCL feeders still absent
Translate to English
Translate to Hindi

1 Public Posts - Mon Dec 11, 2017

4726 views
0

Dec 11 2017 (12:52)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-369              
Not being taken up sir
Translate to English
Translate to Hindi

1 Public Posts - Tue Dec 12, 2017

4708 views
0

Dec 12 2017 (16:02)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-371              
I think they checked all the equipments over the substation marking it fit to work after drawing power cables
Translate to English
Translate to Hindi

1 Public Posts - Tue Dec 12, 2017

4810 views
1

Dec 12 2017 (19:23)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-373              
With feeding from BID substation
Translate to English
Translate to Hindi

1 Public Posts - Wed Dec 13, 2017

2 Public Posts - Thu Dec 14, 2017

2 Public Posts - Fri Dec 15, 2017

1 Public Posts - Sat Dec 16, 2017

1 Public Posts - Sun Dec 17, 2017

4238 views
0

Dec 17 2017 (19:23)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-382              
Sir I haven't travelled in the section
Translate to English
Translate to Hindi

1 Public Posts - Sun Dec 17, 2017

3 Public Posts - Mon Dec 18, 2017

4698 views
2

Dec 18 2017 (14:05)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-387              
Tumbaa olle news Saar!
Translate to English
Translate to Hindi

3 Public Posts - Mon Dec 18, 2017

3 Public Posts - Tue Dec 19, 2017

2 Public Posts - Thu Dec 21, 2017

1 Public Posts - Fri Dec 22, 2017

1 Public Posts - Mon Dec 25, 2017

5637 views
1

Dec 25 2017 (10:53)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-398              
Illa sir. Mysalli yavdu e loco irlilla. I could only capture 12007 at NHY with its diesel loco.
Translate to English
Translate to Hindi

1 Public Posts - Fri Dec 29, 2017

4456 views
1

Dec 29 2017 (20:28)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-400              
Agree. Another subsectioning and paralleling post SSP after srirangapatna near palahalli halt. Another SSP at BDRL already ready. Please note that yeliyur has sectioning and paralleling post SP. And the same is still not ready yet as KPTCL feeders absent
Translate to English
Translate to Hindi

5606 views
1

Dec 30 2017 (11:03)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-401              
Mys - JP 12975 touched 105 between Y-MYA and 100 between MNGT - NHY
Translate to English
Translate to Hindi

1 Public Posts - Sat Dec 30, 2017

4457 views
0

Dec 30 2017 (11:53)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-403              
There is TSR 60KMPH at srirangapatna and also between S-PANP. And track replacement works going on between S-NHY. So speed is still slow
Translate to English
Translate to Hindi

1 Public Posts - Sat Dec 30, 2017

2 Public Posts - Sun Dec 31, 2017

4357 views
3

Dec 31 2017 (12:34)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-407              
I have witnessed trains reaching 110kmph too
Translate to English
Translate to Hindi

6 Public Posts - Sun Dec 31, 2017

4725 views
0

Dec 31 2017 (16:22)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-414              
Was this in RMGM-BID section?
Translate to English
Translate to Hindi

1 Public Posts - Sun Dec 31, 2017

1 Public Posts - Wed Jan 03, 2018

4706 views
1

Jan 03 2018 (21:55)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-417              
Some news reports say it will be announced this month end before PM modi goes for his foreign visit. But the PMO is yet to confirm the same. The same will be a political advantage since elections are nearing in KA. Introduction of a Humsafar and extension of EMU is expected. The route of Humsafar is not yet confirmed or made public
Translate to English
Translate to Hindi

1 Public Posts - Thu Jan 04, 2018

4649 views
0

Jan 04 2018 (11:50)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-419              
It is in KRNR
Translate to English
Translate to Hindi

1 Public Posts - Thu Jan 04, 2018

3 Public Posts - Sat Jan 06, 2018

1 Public Posts - Sun Jan 07, 2018

5167 views
1

Jan 07 2018 (13:18)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-425              
Sir naan mys Alli illa. Nodakke agilla stationge hogi
Translate to English
Translate to Hindi

2 Public Posts - Thu Jan 11, 2018

1 Public Posts - Fri Jan 12, 2018

1 Public Posts - Wed Jan 17, 2018

4993 views
0

Jan 17 2018 (11:58)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-430              
Mys kade illa Saar evaga naanu. Gottadaga heltini
Translate to English
Translate to Hindi

1 Public Posts - Wed Jan 17, 2018

1 Public Posts - Sat Jan 27, 2018

4960 views
2

Jan 27 2018 (21:05)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-433              
Sir Feb 4 modi baro chances ide karnatakakke. So avaga adru agbodu.
Translate to English
Translate to Hindi

1 Public Posts - Sat Jan 27, 2018

5243 views
1

Jan 28 2018 (00:16)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-435              
Huuu. Pitlines almost all complete agide ansutte sir. CPT hatra mainlinedu one line separate agi SWR avru tender kardidru electrificationge. Trains from MYS TO SBC are also arriving on PF1. Works agta ide
Translate to English
Translate to Hindi

1 Public Posts - Sun Jan 28, 2018

4940 views
1

Jan 28 2018 (09:44)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-437              
Illa illa. Shuru agilla innu
Translate to English
Translate to Hindi

1 Public Posts - Tue Feb 06, 2018

4600 views
0

Feb 06 2018 (19:06)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-439              
Humsafar iddalle ide. Destination fix agilla. Yeliyur substationge KPTCL wiring bandilla. Doubling complete. Electrification yard 99% complete
Translate to English
Translate to Hindi

1 Public Posts - Tue Feb 06, 2018

4568 views
0

Feb 06 2018 (20:21)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-441              
Illa illa. En inaugurationu illa.
Translate to English
Translate to Hindi

1 Public Posts - Tue Feb 06, 2018

4656 views
1

Feb 06 2018 (20:49)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-443              
God only knows. Absolutely pathetic
Translate to English
Translate to Hindi

1 Public Posts - Tue Feb 06, 2018

4746 views
0

Feb 06 2018 (22:10)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-445              
No sir freights are not running with eloco. Problem with that would be the non electrified MNGT even after inaguration of the line
Translate to English
Translate to Hindi

1 Public Posts - Tue Feb 06, 2018

4 Public Posts - Fri Feb 09, 2018

1 Public Posts - Sat Feb 10, 2018

1 Public Posts - Thu Feb 15, 2018

7 Public Posts - Fri Feb 16, 2018

1 Public Posts - Sat Feb 17, 2018

5431 views
1

Feb 17 2018 (14:12)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-461              
Illa sir. Adu innu agilla. Haage ide. Srirangapatna SSP kelsanu mugdilla innu
Translate to English
Translate to Hindi

1 Public Posts - Sun Feb 18, 2018

5330 views
1

Feb 18 2018 (14:11)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-463              
Sir one week back naan travel madidde. Innu track works complete agilla full. Loop line electrify agilla. Mainline gottilla
Translate to English
Translate to Hindi

1 Public Posts - Sat Mar 03, 2018

4919 views
1

Mar 03 2018 (15:57)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-465              
Yeliyur substation agilla sir. CPT bagge gottilla
Translate to English
Translate to Hindi

1 Public Posts - Thu Mar 08, 2018

4969 views
0

Mar 08 2018 (08:03)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-467              
Nothing there to explain in detail. Just KPTCL must provide the feeders. Till then the wait is mandatory
Translate to English
Translate to Hindi

4 Public Posts - Thu Mar 08, 2018

1 Public Posts - Wed Mar 14, 2018

2 Public Posts - Fri Mar 16, 2018

1 Public Posts - Wed Mar 21, 2018

4513 views
0

Mar 21 2018 (16:02)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-476              
Oh I'm sorry. I'm not in mysore ryt now
Translate to English
Translate to Hindi

2 Public Posts - Wed Mar 21, 2018

9009 views
5

Mar 23 2018 (16:46)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-479              
Today's link for 12976 JP-MYS SF EXP, LGD WAP7 #30419
Translate to English
Translate to Hindi

1 Public Posts - Fri Mar 23, 2018

6123 views
2

Mar 23 2018 (18:02)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-481              
Mandya
Translate to English
Translate to Hindi

6132 views
0

Apr 13 2018 (19:56)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-482              

1 Public Posts - Mon Apr 23, 2018

1 Public Posts - Sun Jun 03, 2018

5000 views
0

Jun 20 2018 (11:37)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-485              
yeliyur substation not ready. MNGT electrification in progress
Translate to English
Translate to Hindi

1 Public Posts - Wed Jun 20, 2018

12 Public Posts - Fri Jun 29, 2018

4651 views
2

Jun 30 2018 (17:16)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-499              
I think it came with wap7 due to non availability of eloco for 11065 MYS-RU exp. It came to provide eloco for it. Check today if possible sir
Translate to English
Translate to Hindi

3 Public Posts - Sat Jun 30, 2018

1 Public Posts - Sun Jul 01, 2018

4631 views
0

Jul 01 2018 (17:25)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 2294022-504              
As stated earlier
Translate to English
Translate to Hindi

1 Public Posts - Sun Jul 01, 2018

5 Public Posts - Tue Jul 10, 2018

3 Public Posts - Wed Jul 11, 2018
Trip
17842 views
3
Jun 21 2018 (16:23)   12614/Wodeyar SF Express
guest   0 blog posts
Entry# 3557572              
3 compliments
HJ HJ Happy Journey :)

Translate to English
Translate to Hindi

10 Public Posts - Thu Jun 21, 2018

1 Public Posts - Fri Jun 22, 2018

8146 views
1

Jun 22 2018 (20:43)
swaroopghegde~
swaroopghegde~   638 blog posts
Re# 3557572-12              
@3557572-9  
@Pax# 1
12614 has a scheduled stop around 1622 in MYA. post mandya near yeliyur track replacement works are happening with TSR 30/45KMPH. Post Byadarahalli there is PSR75KMPH. RuB work at Naganahalli. So TSR 45KMPH. Hence it struggles post MYA. I have witnessed tippu reaching MNGT as early as 1655
Translate to English
Translate to Hindi
Rail Fanning
13743 views
8

Apr 13 2018 (16:50)   20624/Malgudi SF Express | MYA/Mandya (3 PFs) | LGD/WAP-7/30275
swaroopghegde~
swaroopghegde~   638 blog posts
Entry# 3298529            Tags   Past Edits
16024 YPR-MYS malgudi express came with eloco today.
PS- yeliyur substation is not yet ready. Loco was LGD WAP7 #30275
Translate to English
Translate to Hindi

1 Public Posts - Fri Apr 13, 2018

1 Public Posts - Tue Apr 17, 2018

1 Public Posts - Sat Jul 21, 2018
Page#    321 Blog Entries  <<prev  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3619297 ★★★ 378HBR~
1870067 ★★★ 223GondwanaExpress^~
3242050 ★★★ 349~
5257556 ★★★ 133jishnuthakur12301^...

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy