The rake should be full at-least for such type of train, but seems tough as in RSA? with 15021/22. I mean to say, originating from GKP and reaching to PUNE.....via BST, GD, LKO, CNB, these cities are already having great demand for Metro like Pune. The demand is so huge that even a daily run can not fulfill the need. The CC must have HA1, B2, B3, B4, B5 and PC (24 caocher).